The Solar Power Control and Battery room |
What follows is
- The Roof trusses are fixed in place
- The Chromadek roof, Sisalation, 100 mm insulation plus ceiling board forms the roof
- A screed 50mm is laid in the interior
- The structure is plastered inside and out
- By this time the Chief Fossil will have completed the manufacture of the living room bulkheads
- The house is wired and the LED Strips, Down lights and Ceiling Panels are installed together with the outside strip lights.
- Alumininum Windows and panels are fitted
- Floors are tiled
- The Shower and Vanity and Toilet are added.
- The Kitchen is installed together with back splash
- Solar Panels are fixed to the roof and wired into the Gizmo Room
- The Main Gizmo is as attached to the main circuit board and the batteries should begin charging and there should be 220V ac at the main board.
- Yours truly fits out the dressing room
- Water Plumbing and Gas and sewerage is connected
- Balustrades are added to the Wrap around porch (need to manufacture these first)
- Steps and ramps are added
- A drain is built around the South and East perimeter of the house
Sounds like a lot of work and I am sure that there are items I have omitted.
Andy can you hold that beam up until mid August? |
Gables are about to be added |
Chasing the walls in the small study/library |
Gable on West Side Completed |