Windows and door installed on South side. |
Bedroom Full Height Windows - North Wall |
The windows and doors have started to arrive and as each batch arrives the units are immediately fitted and plastered into their openings.
Dry Wall Partition |
We have erected a drywall partition between the great room and the living area as dictated by SWMBO and this is in the process of being skimmed and painted. Large areas of the inside walls have been painted with plaster coat.
Tiling the floors is well underway. About 120 square metres of tiles need to be laid. The gas stove and extractor fan have arrived and are stacked against a half high wall that will form the spline of the kitchen Island
And we are plastering the ceilings in the one section of the house.