Windows and door installed on South side.
Looking at the pictures not too much appears to have been accomplished. Everything looks to be in a half state of completion because we are working towards completion of several tasks simultaneously.
Bedroom Full Height Windows - North Wall


The windows and doors have started to arrive  and as each batch arrives the units are immediately fitted and plastered into their openings.













Dry Wall Partition




We have erected a drywall partition between the great room and the living area as dictated by SWMBO and this is in the process of being skimmed and painted. Large areas of the inside walls have been painted with plaster coat.







Tiling the floors is well underway. About 120 square metres of tiles need to be laid. The gas stove and extractor fan have arrived and are stacked against a half high wall that will form the spline of the kitchen Island



And we are plastering the ceilings in the one section of the house.