Total Pageviews

Friday, 20 June 2014

Heres a crude design of the Fossil Pad's skeleton.





Here is a rather crude design of the structure's skeleton.
Not drawn to scale.
The main beams will probably be 120mm I Beams.
All the steel is cut and drilled in a factory and is bolted together on site and erected on the slab.







The plan calls for three of these but we may put in four depending on what the structural engineer advises.








The house has steel Purlins to which the Chromadek is attached









No comments:

Post a Comment