The concrete pour

This huge truck arrived complete with a foldable pipe and powerful pump. The operation was controlled from a little control panel equipped with  joysticks by an operator standing at the rear bank of the excavated area.

The concrete was poured to a depth of about 200 mm (300 mm at the front). The whole operation took about 30 minutes,

In three days time we will start laying the bricks for the plinth.