Wednesday, 4 June 2014

The Street Facing wall.

Wall to the left of main entrance.
On both sides of the gate we erected a wall consisting of double bond brick with brick force steel reinforcing between each course.
Wall shown in its un plastered state will be painted when it is fully dry.
About 36 metres of wall in all. Wall was erected between the pillars of a very well constructed stone wall Each division ie. the distance betweem pillars is about 5500 mm.




Wall to the right of the main entrance