Bellechampe

Total Pageviews

2239

Wednesday, 4 June 2014

Some of the Build team

An absolute pleasure to work with these guys. Nothing is too much trouble


Gibson Leader of the Matabele team

Some of the team at Lunch after starting work at 7:00

Hans Lombard - Master Builder






Posted by Unknown at 10:38
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

Unknown
View my complete profile

Blog Archive

  • ►  2015 (2)
    • ►  March (1)
    • ►  January (1)
  • ▼  2014 (47)
    • ►  December (2)
    • ►  October (3)
    • ►  September (6)
    • ►  August (7)
    • ►  July (9)
    • ▼  June (20)
      • Ready for the pour
      • Getting ready for the big pour.
      • Wake me up when it's finished. And don't forget my...
      • Heres a crude design of the Fossil Pad's skeleton.
      • And cleared out 4 Truck Loads of Cacti
      • I can see clearly now - the trees or at least sign...
      • Tree Haircut in progress
      • These trees are due for a severe haircut today
      • The concrete pour
      • Patio Design - If we have any money left over
      • Waiting the Concrete Pump
      • The Minimalist Box
      • Trench Warfare
      • Some of the Build team
      • Kitchen Design
      • Site Excavation
      • The Street Facing wall.
      • The final floor plan design
      • Where the fossils will spend their days
      • La Belle Champe
Picture Window theme. Theme images by andynwt. Powered by Blogger.